Mobile
Log In Sign Up
Home > chinese-english > "gate pier" in English

English translation for "gate pier"

门墩柱
闸门墩


Related Translations:
pier nose:  墩头桥墩墩尖闸墩首部墩尖支墩尖端
pier crane:  码头起重机
square pier:  方形墩
landing pier:  登岸码头靠岸码头起货码头卸货码头栈桥码头
rectangular pier:  矩形桥墩
gravity pier:  重力式墩
pier side:  码头前沿
pier stud:  墩柱
compound pier:  混合扶垛集墩组合柱
seismometer pier:  拾震器墩子
Example Sentences:
1.Slipform construction of songshan spillway weir gate pier on songjianghe river
松江河松山溢洪道工程堰首闸墩滑模施工
2.Numerical simulation of energy dissipator with new style flaring gate pier and stepped spillway
新型宽尾墩和阶梯式溢流坝面一体化消能工数值模拟
3.Based on experimental result of energy dissipation and scour protection for downstream of spillway at yu jian kou power station , this paper discusses the flow characteristics , aerated characteristics of flaring gate pier for low dam pivot , the influence on pressure of dam surface and the result of energy dissipation for flaring gate pier . it is put forward to be an available method to solve the problems of energy dissipation and scour protection for depth of covering strata , poor geologic condition and weakness of resistance to scour capability under reasonable use of flaring gate piers and auxiliary dissipaters . thus , a new method is obtained for release of floodwater and energy dissipation of low dam pivot which are provided with low water head , great unit discharge and low froud coefficient . it may be used for reference for design and test workers
结合鱼剑口电站坝下消能防冲试验研究成果,对低坝枢纽宽尾墩的水流特点、掺气特性、宽尾墩对大坝泄流能力和坝面压力的影响以及宽尾墩的消能效果等问题进行了初步探讨,提出了合理地使用宽尾墩结合辅助消能设施可有效地解决坝下覆盖层深,地质条件差,抗冲能力弱的低坝枢纽的消能防冲问题,从而为具有低水头,大单宽流量,低佛氏数特点的低坝枢纽泄洪消能开辟了一条新途径,可供有关低坝枢纽设计与试验工作者借鉴与参考
4.Abstract : based on experimental result of energy dissipation and scour protection for downstream of spillway at yu jian kou power station , this paper discusses the flow characteristics , aerated characteristics of flaring gate pier for low dam pivot , the influence on pressure of dam surface and the result of energy dissipation for flaring gate pier . it is put forward to be an available method to solve the problems of energy dissipation and scour protection for depth of covering strata , poor geologic condition and weakness of resistance to scour capability under reasonable use of flaring gate piers and auxiliary dissipaters . thus , a new method is obtained for release of floodwater and energy dissipation of low dam pivot which are provided with low water head , great unit discharge and low froud coefficient . it may be used for reference for design and test workers
文摘:结合鱼剑口电站坝下消能防冲试验研究成果,对低坝枢纽宽尾墩的水流特点、掺气特性、宽尾墩对大坝泄流能力和坝面压力的影响以及宽尾墩的消能效果等问题进行了初步探讨,提出了合理地使用宽尾墩结合辅助消能设施可有效地解决坝下覆盖层深,地质条件差,抗冲能力弱的低坝枢纽的消能防冲问题,从而为具有低水头,大单宽流量,低佛氏数特点的低坝枢纽泄洪消能开辟了一条新途径,可供有关低坝枢纽设计与试验工作者借鉴与参考
Similar Words:
"gate oxide layer" English translation, "gate paddle agitator" English translation, "gate parallel condenser" English translation, "gate pass" English translation, "gate pattern" English translation, "gate pinch-off voltage" English translation, "gate pivot" English translation, "gate pole" English translation, "gate polysilicon" English translation, "gate positing" English translation